What’s the definition of done on a project?
The project delivery team’s definition lives in the statement of work. Done means the scope was built, the test cycles passed, the defect count fell below the agreed threshold and the system went live on the planned date. It’s the only one of the three written down with signatures on it, which is why delivery teams treat it as the definition.
The sponsor’s definition lives in the business case: user adoption, and the strategic objectives that were the reason for the project in the first place. Done means the thing the sponsor promised upward: the legacy platform switched off before its support contract renews, a capability shown at the executive meeting in March, a number in a board paper.
The business’s definition is that the people who use the system can do their job on Monday at least as well as they did on Friday. The month-end close still runs, call centre handle times don’t blow out, and the report the operations manager has pulled every Tuesday for six years still exists. This is as much about change management as it is about the technology itself.
The biggest challenge on a project is remembering that all three definitions exist, and that they all matter. The corollary is that there are gaps between them, and those gaps can’t be allowed to stay under the radar. I call it the done gap: the distance between what the delivery team, the sponsor and the business each believe “finished” means.
Why the gap in “done” stays hidden
The gap survives for months because every reporting mechanism on a project measures against the delivery definition. The status report tracks milestones, budget and defects. The RAG status turns amber when the plan slips, and the plan was built from the statement of work. A project can report green for its whole life while drifting away from what the sponsor and the business mean by done, because nothing on the report measures either of them.
Go-live is the first moment all three definitions are tested at once: the delivery team checks its exit criteria, the sponsor checks whether the promised thing happened, and the business turns up on Monday and tries to work. So the gap surfaces as a go-live problem, although it was created in week one.
How to surface and address the gap
It comes down to prompting and visibility. Start by asking one question in the forums the project already has (the project status meeting, sprint retros or the steering committee), but put it to each party separately: “Six months after go-live, what has to be true for you to say this project worked?”
The detail in the answers matters more than how you word the question. Write them down in the speaker’s own words, separate the slogans from specific, measurable outcomes, and what’s left becomes the project’s documented definition of success.
Once you have that, start reporting on it. Make it part of your status presentations, and keep reminding your own team and the wider project team about it.
Then identify the gaps. Ask the same question again four weeks later, put the answers side by side on one page and take it to the sponsor. Each difference becomes one of three things: added to scope, declared out of scope with a named owner on the customer side, or planned as a post-go-live activity.
Definitions drift as people change roles and priorities move, so I bring the page back to the steering committee before each major milestone and ask whether it’s still true.
What I’d tell a new delivery lead
In week two, ask the sponsor, the product/business owner and both project teams, what has to be true six months after go-live for the project to have worked. Write down their exact words.
Put the three answers on one page and walk the sponsor through the differences before the plan is baselined.
Report against that page as well as the plan, every week without fail.